Categories: India

ISRO plans to launch new rocket before Dec 2020

The Indian space agency is working towards launching its new rocket 'Small Satellite Launch Vehicle (SSLV)' before December 2020, said a senior official.

He also said necessary tests to check its biggest motor — booster motor fired by solid fuel — will be done in November.

"The SSLV launch will be from the first launch pad at Sriharikota rocket port after the flight of Polar Satellite Launch Vehicle C49 (PSLV C49). Post PSLV C49's flight, the launch pad set up has to be reconfigured to suit SSLV," S. Somanath, Director, Vikram Sarabhai Space Centre (VSSC) part of the Indian Space Research Organisation (ISRO) told IANS.

Sometime next month PSLV C49 will fly with about 10 satellites. The rocket will be carrying India's RISAT-2BR2 and other commercial satellites. It will be followed by PSLV C50 with the GSAT-12R satellite in December. The rocket is being assembled at Sriharikota with various systems coming from different centres. It will fly from the second launch pad, Somanath said.

"From the drawing board to launch pad the time taken is only about two-and-half years. The SSLV is a three stage/engine rocket all powered by solid fuel," Somanath added.

The 34-metre rocket will have a liftoff mass of 120 tons. The rocket has the capability for multiple satellite launches at different orbits. The SSLV can carry a 500 kg payload for low earth orbit (LEO) and 300 kg for sun-synchronous orbit (SSO).

According to Somanath, the development cost of the rocket is about Rs 120 crore.

"The major development for SSLV is its brand new electronic systems with local components. All the qualifications of the systems have been done. The rocket also has a simple pyrotechnic system," Somanath said.

The new miniaturised telemetry system developed for SSLV has achieved 70 per cent mass reduction in the telemetry package.

According to Somanath, in order to develop the rocket at a lower cost, ISRO with a simplified manufacturing process — for instance, cutting down the machining time wherever possible — went to the next level of vendors with the necessary capabilities.

Somanath said the developmental cost of SSLV is low and only the third stage of the PSLV rocket has been adopted for the new rocket.

The per kg cost of launching a satellite will be similar to that of ISRO's other rocket PSLV.

He said the first payload for SSLV has already been booked and some more payloads are being looked at as the rocket has a capacity to carry up to 500 kg..

IANS

Recent Posts

Pak: Another girls’ school in South Waziristan bombed

In another tragic blow to girls' education in Khyber Pakhtunkhwa amidst the ongoing wave of…

7 hours ago

WHO, experts meet to strategise strengthening community engagement; resilience in health emergencies

Against the backdrop of recent crises, such as the COVID-19 pandemic, health officials from across…

7 hours ago

Baloch activist condemns Gwadar fencing project, cites CPEC as cause of encirclement

Mahrang Baloch, a Balochistan-based activist, said on Saturday that the fence around Gwadar was not…

8 hours ago

“Situation in Bishkek calm”: Kyrgyzstan Foreign Ministry after India issues advisory

Kyrgyzstan's Ministry of Foreign Affairs has said that the situation in Bishkek is calm and…

21 hours ago

“Pakistan is roaming with begging bowl, enemies tremble due to our ‘dhaakad’ govt”: PM Modi

Prime Minister Narendra Modi on Saturday said that enemies of the nation have to think…

22 hours ago

Tibetans rally for release of 11th Panchen Lama amid China’s controversial appointment

In a display of solidarity, exiled Tibetans gathered in Dharamshala on Friday, demanding the release…

23 hours ago